Architectural, Engineering & Construction (AEC)
Project Case Study #1
"I've been on projects on every continent … this is the moon."
- CONSTRUCTION MANAGER
The Challenge:
-
Construction managers must keep:
-
Clearing, grading, surveying, field adjustments, and as-builts in real-time sync with
-
Land Development, Architects, and Engineering teams thousands of miles away
-
-
Satellite internet only available at base camp (not on construction sites)
-
Standard surveying methods intolerably slow and, therefore, $$
AlphaRTK Solutioned all Requirements
Mapping / Interoperability Solution
-
Esri ArcGIS Pro
-
Esri ArcGIS Online
-
Esri Collector (now Field Maps) Offline Workflow
-
Esri ArcGIS Solutions (infrastructure)
-
Autodesk Connector for ArcGIS (Civil 3D users)
-
Esri ArcGIS for AutoCAD (AutoCAD users)
GNSS / RTK Solution
-
AlphaRTK 35w UHF Radio GNSS Base Station
-
4-constellation, 394 channels
-
-
UHF capable GNSS rovers (Eos Arrow Gold)
-
iPad mini user-interface
-
-
Two 50' UHF repeater antennas (added later)
UAS Workflow Solution
-
Two DJI Phantom 4 Pro
-
Map Pilot Pro
-
Remotely designed / managed flight plans
-
-
Installed 29 permanent survey-grade GCP targets
Team specific application views
Interactive maps are available for Architects, Engineers, and Construction Managers to view near real-time updates.​
Finance managers can view near real-time volumetrics of lots, in order to calculate fill requirements.
Spatially accurate engineering design changes are available to the field in near real-time, enabling precision build.